http://bugs.winehq.org/show_bug.cgi?id=21070 Summary: PowerPoint 2003 slows down dramatically. Product: Wine Version: 1.1.31 Platform: x86 OS/Version: Linux Status: UNCONFIRMED Severity: normal Priority: P2 Component: -unknown AssignedTo: wine-bugs(a)winehq.org ReportedBy: lukasz.wojnilowicz(a)gmail.com The problem is that on Wine 1.1.31 PowerPoint 2003 works very very slow. I start application and see how all elements on the main screen of PP2003 are slowly drawn. When I use Compiz, my computer hangs so I need to reset or wait for long time so my computer unlocks for a second. The same happens for all AutoCADs 2008 when I'm in "2D Drafting & Annotation" mode. I see that all small icons from toolbox are drawn but it's very very slow. No problem at all on Wine 1.1.30. Regression test did give: 6b8753185f30197047773af6a26eafd34d45367c is the first bad commit commit 6b8753185f30197047773af6a26eafd34d45367c Author: Roderick Colenbrander <thunderbird2k(a)gmail.com> Date: Sat Sep 26 14:52:46 2009 +0200 winex11: Add support for 16-bit/32-bit DIB sections. :040000 040000 f2d2821909d152a1d37ae2932bf6017d7b622344 74221a3bdd0b8be716ed4c7900a58fddc93a2f08 M dlls -- Configure bugmail: http://bugs.winehq.org/userprefs.cgi?tab=email Do not reply to this email, post in Bugzilla using the above URL to reply. ------- You are receiving this mail because: ------- You are watching all bug changes.