Michael Stefaniuc mstefani@redhat.com writes:
Alexandre Julliard wrote:
We need a code freeze and stabilization period before the release. My thinking is that we should have a 1.0rc1 release, probably sometime in May, and from that point on only accept small obvious fixes. Then we'd
What about small janitorial patches?
Obvious low risk patches could go in, but I don't see much need to put in janitorial patches during the rc phase, they can just as well wait until 1.0 is out.